Arapahoe High School Library Renovation
Arapahoe High School opened this newly renovated Library in the fall of 2014. The renovated space gave the students and the community a chance to heal following the tragic shooting that occurred at the school in December of 2013.
Yon Tanner Architecture, with a team of Arapahoe High School Students, won a design competition in the spring of 2014 to bring new life to the space. The new library boasts a technology help desk run by the school computer club, power outlets throughout the space (instead of a single computer lab) and three large study rooms to emphasize the collaborative nature of the school.
The students handled much of the interior design details of the library, like a memory book signed by all students to be placed in a time capsule, comfortable furniture, a café space and a large compass to be placed above the central room.
Construction cost was estimated at $1.1 -$1.35 million, much of which was raised through the donation of time and materials from local construction, architectural and engineering firms. We were proud to be part of this team.
Arapahoe High School opened this newly renovated Library in the fall of 2014. The renovated space gave the students and the community a chance to heal following the tragic shooting that occurred at the school in December of 2013.
Yon Tanner Architecture, with a team of Arapahoe High School Students, won a design competition in the spring of 2014 to bring new life to the space. The new library boasts a technology help desk run by the school computer club, power outlets throughout the space (instead of a single computer lab) and three large study rooms to emphasize the collaborative nature of the school.
The students handled much of the interior design details of the library, like a memory book signed by all students to be placed in a time capsule, comfortable furniture, a café space and a large compass to be placed above the central room.
Construction cost was estimated at $1.1 -$1.35 million, much of which was raised through the donation of time and materials from local construction, architectural and engineering firms. We were proud to be part of this team.